Waterways Commission      
     Capital Outlay Plan FY11-FY17      
  FY11 FY12 FY13 FY14 FY 15 FY 16 FY 17 FY 17 FY 18  
                                                       
Harbor Planning Article      
1. Saquatucket Harbor        
a. North bulkhead  (plus west ramp)                   584'            
i. Maintenance       $200,000      
ii. Replacement         $1,500,000    
b. East bulkhead (old fuel dock & east side ramp)  242'            
iii. Replacement           $700,200    
iv. Pilings        
3. Steel remaining   24        
1. Floats         $275,000    
vii. Downey property (adjacent to marina)   $1,250,000        
1. Rack storage for smaller boats        
2. Increase parking   $200,000        
xii. Bank street harbormaster workshop      
2. Move workshop to Downey property      
   Channel to tip of jetties      
Dredging inner Channel & marina         $2,000,000  
viii. Outer channel        
1. Dredging    (7,000 cu yds beach sand long haul) $77,000       $90,000      
2. Allen Harbor        
a. Inner basin        
i. Bulkhead-new south facing blkhd   $260,000      
ii. Pilings/docks        
v. Dredging   $92,000        
vi. Parking Lot     $100,000        
b. Jetty Area-from tip to where rock ends       $1,200,000  
c. Outer channel        
i. Dredging (8,000 cu.yds beach sand long haul) $88,000   $60,000   $90,000   $70,000   $70,000  
d. Inner basin to jetty (inner end)        
i. Dredging  (40,000 cu yds of sludge)   $2,500,000        
3. Wychmere Inner Harbor        
a. Channel from Outer to Inner Harbors            
i. Dredge     $40,000     $40,000      
b. Basin        
i. Dredge         $2,500,000    
 Town Dock        
ii. Paving, storm treat removal & basin installation   $167,307        
iii. East side        
1. Extend bulkhead towards restrooms?????????            
 2. Replace Restrooms   $50,000        
4. Wychmere Outer Harbor        
1. Needs raising to be a “Harbor of Refuge”            
2. Entrance Light-West Jetty        
1. Lengthen          
v. Basin        
1. Dredge       160000      
a. More moorings possible          
2. Deepen          
5. Round Cove        
a. Opening from Pleasant Bay        
i. Dredging $35,000   $35,000   $35,000    
b. Basin        
i. Dredging            
i. Non-buildable lot        
ii. Expanded parking            
f. Ramp              
h. Bulkhead       $300,000      
6. Herring River        
i. Dredging   $50,000        
Replace Wixon Dock   $45,000        
ii. Pave ramp          
7. Town Ramp-Rt 28        
 Paved Ramp   $100,000      
TOTAL BY YEAR $200,000 $4,012,307 $542,000 $295,000 $680,000 $475,000 $4,105,000 $700,200 $3,270,000  
         
       
  SHORT ITEMS      
            
  FY11 FY12 FY13 FY14 FY 15 FY 16  
Saquatucket Harbor              
Washdown system   $35,000    
East Bulkhead (old fuel dock) maintenance      
Electric/water towers     $50,000  
Allen Harbor      
Rest Rooms   $50,000    
Replacement of jettty light   $15,000      
Wychmere     $15,000  
Replace Dingy Dock      
Fuel Dock fill and expand parking      
Needs raising outer Harbor beakwater      
Round Cove    
Replace dock/float   $35,000  
TOTAL BY YEAR $0 $0 $15,000 $50,000 $35,000 $65,000